NE Santa Rosa RD over Br of Grindstone C
GoodDeKalb County, Missouri · S 24 T 59 N R 30 W · Structure no. 29279
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 36 ft
- 1 main span
- Daily traffic
- 25
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
NE Santa Rosa RD over Br of Grindstone C is a steel stringer/multi-beam or girder carrying NE Santa Rosa RD over Br of Grindstone C in DeKalb County, Missouri. It was built in 2002, so it is 23 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25 vehicles a day, roughly 10% of them trucks, projected to reach 29 by 2044. The structure is 36 ft (11 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NE Santa Rosa RD over Br of Grindstone C built?
It was built in 2002, making it 23 years old in 2025.
What condition is NE Santa Rosa RD over Br of Grindstone C in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does NE Santa Rosa RD over Br of Grindstone C carry?
About 25 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is NE Santa Rosa RD over Br of Grindstone C?
The structure is 36 ft (11 m) long with a longest span of 35 ft (10.7 m) and a deck 18 ft wide.
Who owns NE Santa Rosa RD over Br of Grindstone C?
It is owned by the County Highway Agency.