NW Lakesite RD over Br of M Fk Lost CR
FairDeKalb County, Missouri · S 3 T 59 N R 31 W · Structure no. 15380
- Built
- 1910
- 115 years old, rebuilt 2010
- Condition
- Fair
- inspected January 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 24 ft
- 1 main span
- Daily traffic
- 15
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
NW Lakesite RD over Br of M Fk Lost CR is a steel stringer/multi-beam or girder carrying NW Lakesite RD over Br of M Fk Lost CR in DeKalb County, Missouri. It was built in 1910 and reconstructed in 2010, so it is 115 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 17 by 2044. The structure is 24 ft (7.2 m) long and 20 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW Lakesite RD over Br of M Fk Lost CR built?
It was built in 1910, making it 115 years old in 2025. It was reconstructed in 2010.
What condition is NW Lakesite RD over Br of M Fk Lost CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.
How much traffic does NW Lakesite RD over Br of M Fk Lost CR carry?
About 15 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is NW Lakesite RD over Br of M Fk Lost CR?
The structure is 24 ft (7.2 m) long with a longest span of 23 ft (6.9 m) and a deck 20 ft wide.
Who owns NW Lakesite RD over Br of M Fk Lost CR?
It is owned by the County Highway Agency.