Lilac Ave over Lost CR
PoorDaviess County, Missouri · S 27 T 60 N R 27 W · Structure no. 23655
- Built
- 1977
- 48 years old, rebuilt 2004
- Condition
- Poor
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 54 ft
- 3 main spans
- Daily traffic
- 60
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Lilac Ave over Lost CR is a steel stringer/multi-beam or girder carrying Lilac Ave over Lost CR in Daviess County, Missouri. It was built in 1977 and reconstructed in 2004, so it is 48 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 60 vehicles a day, roughly 10% of them trucks, projected to reach 69 by 2044. The structure is 54 ft (16.5 m) long and 16 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lilac Ave over Lost CR built?
It was built in 1977, making it 48 years old in 2025. It was reconstructed in 2004.
What condition is Lilac Ave over Lost CR in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2024.
How much traffic does Lilac Ave over Lost CR carry?
About 60 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Lilac Ave over Lost CR?
The structure is 54 ft (16.5 m) long with a longest span of 23 ft (7 m) and a deck 16 ft wide.
Who owns Lilac Ave over Lost CR?
It is owned by the County Highway Agency.