US Bridges

Rt C E over Is 35

Fair

Daviess County, Missouri · S 18 T 61 N R 28 W · Structure no. 1500

Built
1972
53 years old, rebuilt 2019
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
248 ft
2 main spans
Daily traffic
675
2024 count
Owner
State
State Highway Agency

About this bridge

Rt C E over Is 35 is a steel continuous stringer/multi-beam or girder carrying Rt C E over Is 35 in Daviess County, Missouri. It was built in 1972 and reconstructed in 2019, so it is 53 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 675 vehicles a day, roughly 12% of them trucks, projected to reach 878 by 2044. The structure is 248 ft (75.6 m) long and 43 ft wide. If it were closed, the detour would be 14.9 mi (24 km).

CarriesRt C E
CrossesIs 35
LocationS 18 T 61 N R 28 W
RouteState Highway 0C
Coordinates40.07646, -94.09341
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadH 20
Structure length248 ft (75.6 m)
Longest span86 ft (26.2 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic675 (2024)
Projected traffic878 by 2044
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rt C E over Is 35 built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2019.

What condition is Rt C E over Is 35 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Rt C E over Is 35 carry?

About 675 vehicles per day (2024 count), of which roughly 12% are trucks.

How long is Rt C E over Is 35?

The structure is 248 ft (75.6 m) long with a longest span of 86 ft (26.2 m) and a deck 43 ft wide.

Who owns Rt C E over Is 35?

It is owned by the State Highway Agency.