US Bridges

Lorenzo Greene DR over Br of Moreau River

Fair

Cole County, Missouri · S 25 T 44 N R 12 W · Structure no. 30853

Built
1978
47 years old
Condition
Fair
inspected October 2023
Type
Culvert
Concrete Continuous
Length
33 ft
2 main spans
Daily traffic
5,240
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lorenzo Greene DR over Br of Moreau River is a concrete continuous culvert carrying Lorenzo Greene DR over Br of Moreau River in Cole County, Missouri. It was built in 1978, so it is 47 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,240 vehicles a day, roughly 10% of them trucks, projected to reach 8,646 by 2044. The structure is 33 ft (10.1 m) long. If it were closed, the detour would be 6.2 mi (10 km).

CarriesLorenzo Greene DR
CrossesBr of Moreau River
LocationS 25 T 44 N R 12 W
RouteCity Street 0
Coordinates38.53669, -92.18882
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating32.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadUnknown
Structure length33 ft (10.1 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,240 (2024)
Projected traffic8,646 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lorenzo Greene DR over Br of Moreau River built?

It was built in 1978, making it 47 years old in 2025.

What condition is Lorenzo Greene DR over Br of Moreau River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Lorenzo Greene DR over Br of Moreau River carry?

About 5,240 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Lorenzo Greene DR over Br of Moreau River?

The structure is 33 ft (10.1 m) long with a longest span of 8 ft (2.4 m).

Who owns Lorenzo Greene DR over Br of Moreau River?

It is owned by the City or Municipal Highway Agency.