US Bridges

Payne RD over South Moreau Creek

Fair

Cole County, Missouri · S 27 T 43 N R 14 W · Structure no. 28892

Built
1999
26 years old
Condition
Fair
inspected October 2023
Type
Slab
Concrete
Length
23 ft
1 main span
Daily traffic
29
2024 count
Owner
County
County Highway Agency

About this bridge

Payne RD over South Moreau Creek is a concrete slab carrying Payne RD over South Moreau Creek in Cole County, Missouri. It was built in 1999, so it is 26 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 29 vehicles a day, roughly 5% of them trucks, projected to reach 49 by 2044. The structure is 23 ft (7.1 m) long and 18 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesPayne RD
CrossesSouth Moreau Creek
LocationS 27 T 43 N R 14 W
RouteCounty Highway 155
Coordinates38.46025, -92.45308
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating49.6 US tons
Inventory rating29.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length23 ft (7.1 m)
Longest span23 ft (7.1 m)
Deck width18 ft (5.6 m)
Roadway width17 ft (5.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic29 (2024)
Projected traffic49 by 2044
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Payne RD over South Moreau Creek built?

It was built in 1999, making it 26 years old in 2025.

What condition is Payne RD over South Moreau Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Payne RD over South Moreau Creek carry?

About 29 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Payne RD over South Moreau Creek?

The structure is 23 ft (7.1 m) long with a longest span of 23 ft (7.1 m) and a deck 18 ft wide.

Who owns Payne RD over South Moreau Creek?

It is owned by the County Highway Agency.