US Bridges

Rt V E over Is 35

Good

Clinton County, Missouri · S 8 T 54 N R 30 W · Structure no. 8198

Built
1964
61 years old, rebuilt 2010
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
259 ft
4 main spans
Daily traffic
285
2024 count
Owner
State
State Highway Agency

About this bridge

Rt V E over Is 35 is a steel continuous stringer/multi-beam or girder carrying Rt V E over Is 35 in Clinton County, Missouri. It was built in 1964 and reconstructed in 2010, so it is 61 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 285 vehicles a day, roughly 7% of them trucks, projected to reach 371 by 2044. The structure is 259 ft (78.9 m) long and 29 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesRt V E
CrossesIs 35
LocationS 8 T 54 N R 30 W
RouteState Highway 0V
Coordinates39.49907, -94.29614
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating27.8 US tons
Inventory rating16.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length259 ft (78.9 m)
Longest span73 ft (22.3 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic285 (2024)
Projected traffic371 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rt V E over Is 35 built?

It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2010.

What condition is Rt V E over Is 35 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Rt V E over Is 35 carry?

About 285 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Rt V E over Is 35?

The structure is 259 ft (78.9 m) long with a longest span of 73 ft (22.3 m) and a deck 29 ft wide.

Who owns Rt V E over Is 35?

It is owned by the State Highway Agency.