144th ST over First CR
FairPosted for loadClay County, Missouri · S 3 T 52 N R 33 W · Structure no. 17557
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 33 ft
- 1 main span
- Daily traffic
- 300
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
144th ST over First CR is a steel stringer/multi-beam or girder carrying 144th ST over First CR in Clay County, Missouri. It was built in 1978, so it is 47 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 480 by 2044. The structure is 33 ft (10.1 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 144th ST over First CR built?
It was built in 1978, making it 47 years old in 2025.
What condition is 144th ST over First CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does 144th ST over First CR carry?
About 300 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is 144th ST over First CR?
The structure is 33 ft (10.1 m) long with a longest span of 32 ft (9.8 m) and a deck 29 ft wide.
Who owns 144th ST over First CR?
It is owned by the City or Municipal Highway Agency.