US Bridges

Mo 125 S over Finley CR

Good

Christian County, Missouri · S 16 T 27 N R 20 W · Structure no. 33665

Built
2011
14 years old
Condition
Good
inspected June 2024
Type
Tee Beam
Prestressed Concrete
Length
309 ft
3 main spans
Daily traffic
2,664
2024 count
Owner
State
State Highway Agency

About this bridge

Mo 125 S over Finley CR is a prestressed concrete tee beam carrying Mo 125 S over Finley CR in Christian County, Missouri. It was built in 2011, so it is 14 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,664 vehicles a day, roughly 9% of them trucks, projected to reach 5,195 by 2044. The structure is 309 ft (94.2 m) long and 30 ft wide. If it were closed, the detour would be 29.2 mi (47 km).

CarriesMo 125 S
CrossesFinley CR
LocationS 16 T 27 N R 20 W
RouteState Highway 125
Coordinates37.0455, -93.13364
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.4 US tons
Inventory rating46.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length309 ft (94.2 m)
Longest span103 ft (31.4 m)
Deck width30 ft (9.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,664 (2024)
Projected traffic5,195 by 2044
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.2 mi (47 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mo 125 S over Finley CR built?

It was built in 2011, making it 14 years old in 2025.

What condition is Mo 125 S over Finley CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Mo 125 S over Finley CR carry?

About 2,664 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is Mo 125 S over Finley CR?

The structure is 309 ft (94.2 m) long with a longest span of 103 ft (31.4 m) and a deck 30 ft wide.

Who owns Mo 125 S over Finley CR?

It is owned by the State Highway Agency.