US Bridges

Cambridge RD over Fork East CR

Good

Cass County, Missouri · S 14 T 46 N R 33 W · Structure no. 37103

Built
2023
2 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
37 ft
3 main spans
Daily traffic
1,000
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cambridge RD over Fork East CR is a concrete culvert carrying Cambridge RD over Fork East CR in Cass County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 10% of them trucks, projected to reach 1,600 by 2044. The structure is 37 ft (11.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCambridge RD
CrossesFork East CR
LocationS 14 T 46 N R 33 W
RouteCity Street 11
Coordinates38.8006, -94.5432
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating87.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length37 ft (11.4 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2024)
Projected traffic1,600 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cambridge RD over Fork East CR built?

It was built in 2023, making it 2 years old in 2025.

What condition is Cambridge RD over Fork East CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Cambridge RD over Fork East CR carry?

About 1,000 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Cambridge RD over Fork East CR?

The structure is 37 ft (11.4 m) long with a longest span of 12 ft (3.7 m).

Who owns Cambridge RD over Fork East CR?

It is owned by the City or Municipal Highway Agency.