US Bridges

County Road 240 over Lit Wakenda CR

FairPosted for load

Carroll County, Missouri · S 16 T 53 N R 23 W · Structure no. 22734

Built
1960
65 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
50 ft
1 main span
Daily traffic
35
2024 count
Owner
County
County Highway Agency

About this bridge

County Road 240 over Lit Wakenda CR is a steel stringer/multi-beam or girder carrying County Road 240 over Lit Wakenda CR in Carroll County, Missouri. It was built in 1960, so it is 65 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 35 vehicles a day, roughly 10% of them trucks, projected to reach 39 by 2044. The structure is 50 ft (15.2 m) long and 18 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCounty Road 240
CrossesLit Wakenda CR
LocationS 16 T 53 N R 23 W
RouteCounty Highway 372
Coordinates39.41279, -93.49286
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating14.9 US tons
Inventory rating7.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadOther
Structure length50 ft (15.2 m)
Longest span50 ft (15.2 m)
Deck width18 ft (5.5 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2024)
Projected traffic39 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$272,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 240 over Lit Wakenda CR built?

It was built in 1960, making it 65 years old in 2025.

What condition is County Road 240 over Lit Wakenda CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does County Road 240 over Lit Wakenda CR carry?

About 35 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is County Road 240 over Lit Wakenda CR?

The structure is 50 ft (15.2 m) long with a longest span of 50 ft (15.2 m) and a deck 18 ft wide.

Who owns County Road 240 over Lit Wakenda CR?

It is owned by the County Highway Agency.