Crd 501 over Apple Crk
GoodCape Girardeau County, Missouri · S 6 T 33 N R 12 E · Structure no. 37080
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected November 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 10
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Crd 501 over Apple Crk is a prestressed concrete continuous box beam or girders - multiple carrying Crd 501 over Apple Crk in Cape Girardeau County, Missouri. It was built in 2024, so it is 1 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 16 by 2044. The structure is 137 ft (41.9 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Crd 501 over Apple Crk built?
It was built in 2024, making it 1 years old in 2025.
What condition is Crd 501 over Apple Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.
How much traffic does Crd 501 over Apple Crk carry?
About 10 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Crd 501 over Apple Crk?
The structure is 137 ft (41.9 m) long with a longest span of 65 ft (19.8 m) and a deck 27 ft wide.
Who owns Crd 501 over Apple Crk?
It is owned by the County Highway Agency.