County RD 238 over Diversion Chnl
FairCape Girardeau County, Missouri · S 6 T 29 N R 12 E · Structure no. 17361
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected January 2024
- Type
- Girder and Floorbeam System
- Steel
- Length
- 236 ft
- 3 main spans
- Daily traffic
- 110
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 238 over Diversion Chnl is a steel girder and floorbeam system carrying County RD 238 over Diversion Chnl in Cape Girardeau County, Missouri. It was built in 1980, so it is 45 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 110 vehicles a day, roughly 10% of them trucks, projected to reach 176 by 2044. The structure is 236 ft (71.9 m) long and 15 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 238 over Diversion Chnl built?
It was built in 1980, making it 45 years old in 2025.
What condition is County RD 238 over Diversion Chnl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does County RD 238 over Diversion Chnl carry?
About 110 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is County RD 238 over Diversion Chnl?
The structure is 236 ft (71.9 m) long with a longest span of 120 ft (36.7 m) and a deck 15 ft wide.
Who owns County RD 238 over Diversion Chnl?
It is owned by the County Highway Agency.