E 2nd ST over Stinson CR
FairCallaway County, Missouri · S 16 T 47 N R 9 W · Structure no. 36809
- Built
- 2022
- 3 years old
- Condition
- Fair
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 4,190
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E 2nd ST over Stinson CR is a prestressed concrete box beam or girders - multiple carrying E 2nd ST over Stinson CR in Callaway County, Missouri. It was built in 2022, so it is 3 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,190 vehicles a day, roughly 15% of them trucks, projected to reach 6,495 by 2043. The structure is 80 ft (24.4 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E 2nd ST over Stinson CR built?
It was built in 2022, making it 3 years old in 2025.
What condition is E 2nd ST over Stinson CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does E 2nd ST over Stinson CR carry?
About 4,190 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is E 2nd ST over Stinson CR?
The structure is 80 ft (24.4 m) long with a longest span of 78 ft (23.8 m) and a deck 48 ft wide.
Who owns E 2nd ST over Stinson CR?
It is owned by the City or Municipal Highway Agency.