NW College DR over Br of Brushy CR
GoodCaldwell County, Missouri · S 5 T 57 N R 29 W · Structure no. 37116
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected January 2024
- Type
- Culvert
- Aluminum, Wrought Iron, or Cast Iron
- Length
- 25 ft
- 1 main span
- Daily traffic
- 35
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
NW College DR over Br of Brushy CR is a aluminum, wrought iron, or cast iron culvert carrying NW College DR over Br of Brushy CR in Caldwell County, Missouri. It was built in 2023, so it is 2 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 35 vehicles a day, roughly 10% of them trucks, projected to reach 40 by 2043. The structure is 25 ft (7.5 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 9 Excellent | No problems noted. |
| Culvert | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NW College DR over Br of Brushy CR built?
It was built in 2023, making it 2 years old in 2025.
What condition is NW College DR over Br of Brushy CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does NW College DR over Br of Brushy CR carry?
About 35 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is NW College DR over Br of Brushy CR?
The structure is 25 ft (7.5 m) long with a longest span of 25 ft (7.5 m) and a deck 24 ft wide.
Who owns NW College DR over Br of Brushy CR?
It is owned by the County Highway Agency.