US Bridges

US 67 S over Harviell Drain Dtc

Good

Butler County, Missouri · S 27 T 23 N R 5 E · Structure no. 37392

Built
2024
1 years old
Condition
Good
inspected September 2024
Type
Tee Beam
Prestressed Concrete
Length
89 ft
1 main span
Daily traffic
6,441
2024 count
Owner
State
State Highway Agency

About this bridge

US 67 S over Harviell Drain Dtc is a prestressed concrete tee beam carrying US 67 S over Harviell Drain Dtc in Butler County, Missouri. It was built in 2024, so it is 1 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: new structure not yet open to traffic.

It carries about 6,441 vehicles a day, roughly 27% of them trucks, projected to reach 11,272 by 2044. The structure is 89 ft (27.2 m) long and 31 ft wide. If it were closed, the detour would be 26.1 mi (42 km).

CarriesUS 67 S
CrossesHarviell Drain Dtc
LocationS 27 T 23 N R 5 E
RouteU.S. Route 67
Coordinates36.60793, -90.52044
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusNew structure not yet open to traffic
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.4 US tons
Inventory rating44.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length89 ft (27.2 m)
Longest span83 ft (25.2 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,441 (2024)
Projected traffic11,272 by 2044
Trucks27%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed26.1 mi (42 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 67 S over Harviell Drain Dtc built?

It was built in 2024, making it 1 years old in 2025.

What condition is US 67 S over Harviell Drain Dtc in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does US 67 S over Harviell Drain Dtc carry?

About 6,441 vehicles per day (2024 count), of which roughly 27% are trucks.

How long is US 67 S over Harviell Drain Dtc?

The structure is 89 ft (27.2 m) long with a longest span of 83 ft (25.2 m) and a deck 31 ft wide.

Who owns US 67 S over Harviell Drain Dtc?

It is owned by the State Highway Agency.