US Bridges

S 11th ST over Pike CR

Good

Butler County, Missouri · S 9 T 24 N R 6 E · Structure no. 36689

Built
2020
5 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
200
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

S 11th ST over Pike CR is a prestressed concrete box beam or girders - single or spread carrying S 11th ST over Pike CR in Butler County, Missouri. It was built in 2020, so it is 5 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 15% of them trucks, projected to reach 270 by 2044. The structure is 80 ft (24.4 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesS 11th ST
CrossesPike CR
LocationS 9 T 24 N R 6 E
RouteCounty Highway 420
Coordinates36.73746, -90.41185
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72.4 US tons
Inventory rating30.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span70 ft (21.2 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2024)
Projected traffic270 by 2044
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S 11th ST over Pike CR built?

It was built in 2020, making it 5 years old in 2025.

What condition is S 11th ST over Pike CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does S 11th ST over Pike CR carry?

About 200 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is S 11th ST over Pike CR?

The structure is 80 ft (24.4 m) long with a longest span of 70 ft (21.2 m) and a deck 26 ft wide.

Who owns S 11th ST over Pike CR?

It is owned by the City or Municipal Highway Agency.