US Bridges

Rp MO759N to IS229 over Fill

Fair

Buchanan County, Missouri · S 20 T 57 N R 35 W · Structure no. 11847

Built
1979
46 years old
Condition
Fair
inspected July 2024
Type
Slab
Concrete Continuous
Length
62 ft
2 main spans
Daily traffic
3,982
2024 count
Owner
State
State Highway Agency

About this bridge

Rp MO759N to IS229 over Fill is a concrete continuous slab carrying Rp MO759N to IS229 over Fill in Buchanan County, Missouri. It was built in 1979, so it is 46 years old, older than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,982 vehicles a day, roughly 20% of them trucks, projected to reach 6,769 by 2044. The structure is 62 ft (18.9 m) long and 28 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesRp MO759N to IS229
CrossesFill
LocationS 20 T 57 N R 35 W
RouteState Highway 0
Coordinates39.74842, -94.85401
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.4 US tons
Inventory rating47.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length62 ft (18.9 m)
Longest span31 ft (9.3 m)
Deck width28 ft (8.6 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,982 (2024)
Projected traffic6,769 by 2044
Trucks20%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesOther
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Rp MO759N to IS229 over Fill built?

It was built in 1979, making it 46 years old in 2025.

What condition is Rp MO759N to IS229 over Fill in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Rp MO759N to IS229 over Fill carry?

About 3,982 vehicles per day (2024 count), of which roughly 20% are trucks.

How long is Rp MO759N to IS229 over Fill?

The structure is 62 ft (18.9 m) long with a longest span of 31 ft (9.3 m) and a deck 28 ft wide.

Who owns Rp MO759N to IS229 over Fill?

It is owned by the State Highway Agency.