US Bridges

Mexico Gravel RD over Hinkson CR

Good

Boone County, Missouri · S 33 T 49 N R 12 W · Structure no. 33540

Built
2009
16 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
317 ft
3 main spans
Daily traffic
950
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mexico Gravel RD over Hinkson CR is a steel continuous stringer/multi-beam or girder carrying Mexico Gravel RD over Hinkson CR in Boone County, Missouri. It was built in 2009, so it is 16 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 950 vehicles a day, roughly 10% of them trucks, projected to reach 1,663 by 2043. The structure is 317 ft (96.6 m) long and 54 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesMexico Gravel RD
CrossesHinkson CR
LocationS 33 T 49 N R 12 W
RouteCity Street 93
Coordinates38.98178, -92.27902
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating76.4 US tons
Inventory rating45.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length317 ft (96.6 m)
Longest span120 ft (36.6 m)
Deck width54 ft (16.5 m)
Roadway width35 ft (10.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic950 (2023)
Projected traffic1,663 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mexico Gravel RD over Hinkson CR built?

It was built in 2009, making it 16 years old in 2025.

What condition is Mexico Gravel RD over Hinkson CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Mexico Gravel RD over Hinkson CR carry?

About 950 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Mexico Gravel RD over Hinkson CR?

The structure is 317 ft (96.6 m) long with a longest span of 120 ft (36.6 m) and a deck 54 ft wide.

Who owns Mexico Gravel RD over Hinkson CR?

It is owned by the City or Municipal Highway Agency.