US Bridges

Rt B S over Indian CR

Good

Benton County, Missouri · S 32 T 42 N R 20 W · Structure no. 36012

Built
2019
6 years old
Condition
Good
inspected October 2024
Type
Slab
Concrete Continuous
Length
91 ft
3 main spans
Daily traffic
1,177
2024 count
Owner
State
State Highway Agency

About this bridge

Rt B S over Indian CR is a concrete continuous slab carrying Rt B S over Indian CR in Benton County, Missouri. It was built in 2019, so it is 6 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,177 vehicles a day, roughly 7% of them trucks, projected to reach 1,883 by 2044. The structure is 91 ft (27.6 m) long and 27 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesRt B S
CrossesIndian CR
LocationS 32 T 42 N R 20 W
RouteState Highway 0B
Coordinates38.3671, -93.16083
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating94.2 US tons
Inventory rating56.5 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length91 ft (27.6 m)
Longest span29 ft (8.8 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,177 (2024)
Projected traffic1,883 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt B S over Indian CR built?

It was built in 2019, making it 6 years old in 2025.

What condition is Rt B S over Indian CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Rt B S over Indian CR carry?

About 1,177 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Rt B S over Indian CR?

The structure is 91 ft (27.6 m) long with a longest span of 29 ft (8.8 m) and a deck 27 ft wide.

Who owns Rt B S over Indian CR?

It is owned by the State Highway Agency.