US Bridges

NE 80th RD over Trib Clear CR

Good

Barton County, Missouri · S 17 T 33 N R 30 W · Structure no. 33886

Built
2011
14 years old
Condition
Good
inspected March 2023
Type
Slab
Concrete
Length
24 ft
1 main span
Daily traffic
15
2023 count
Owner
County
County Highway Agency

About this bridge

NE 80th RD over Trib Clear CR is a concrete slab carrying NE 80th RD over Trib Clear CR in Barton County, Missouri. It was built in 2011, so it is 14 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 21 by 2043. The structure is 24 ft (7.3 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNE 80th RD
CrossesTrib Clear CR
LocationS 17 T 33 N R 30 W
RouteCounty Highway 95
Coordinates37.61658, -94.24619
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.4 US tons
Inventory rating41.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length24 ft (7.3 m)
Longest span21 ft (6.4 m)
Deck width26 ft (7.8 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15 (2023)
Projected traffic21 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NE 80th RD over Trib Clear CR built?

It was built in 2011, making it 14 years old in 2025.

What condition is NE 80th RD over Trib Clear CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does NE 80th RD over Trib Clear CR carry?

About 15 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is NE 80th RD over Trib Clear CR?

The structure is 24 ft (7.3 m) long with a longest span of 21 ft (6.4 m) and a deck 26 ft wide.

Who owns NE 80th RD over Trib Clear CR?

It is owned by the County Highway Agency.