Farm RD 2020 over Clear CR
FairBarry County, Missouri · S 5 T 25 N R 27 W · Structure no. 18587
- Built
- 1991
- 34 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 64 ft
- 1 main span
- Daily traffic
- 500
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Farm RD 2020 over Clear CR is a prestressed concrete stringer/multi-beam or girder carrying Farm RD 2020 over Clear CR in Barry County, Missouri. It was built in 1991, so it is 34 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 850 by 2044. The structure is 64 ft (19.5 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Farm RD 2020 over Clear CR built?
It was built in 1991, making it 34 years old in 2025.
What condition is Farm RD 2020 over Clear CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Farm RD 2020 over Clear CR carry?
About 500 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Farm RD 2020 over Clear CR?
The structure is 64 ft (19.5 m) long with a longest span of 62 ft (18.9 m) and a deck 27 ft wide.
Who owns Farm RD 2020 over Clear CR?
It is owned by the County Highway Agency.