Rt N S over Lit Tarkio CR
FairPosted for loadAtchison County, Missouri · S 26 T 65 N R 39 W · Structure no. 8237
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 201 ft
- 3 main spans
- Daily traffic
- 182
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Rt N S over Lit Tarkio CR is a steel continuous stringer/multi-beam or girder carrying Rt N S over Lit Tarkio CR in Atchison County, Missouri. It was built in 1962, so it is 63 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 182 vehicles a day, roughly 11% of them trucks, projected to reach 237 by 2044. The structure is 201 ft (61.3 m) long and 24 ft wide. If it were closed, the detour would be 26.7 mi (43 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Rt N S over Lit Tarkio CR built?
It was built in 1962, making it 63 years old in 2025.
What condition is Rt N S over Lit Tarkio CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Rt N S over Lit Tarkio CR carry?
About 182 vehicles per day (2024 count), of which roughly 11% are trucks.
How long is Rt N S over Lit Tarkio CR?
The structure is 201 ft (61.3 m) long with a longest span of 75 ft (22.9 m) and a deck 24 ft wide.
Who owns Rt N S over Lit Tarkio CR?
It is owned by the State Highway Agency.