250 ST over Tarkio Rvr
PoorPosted for loadAtchison County, Missouri · S 9 T 64 N R 40 W · Structure no. 23183
- Built
- 1975
- 50 years old
- Condition
- Poor
- inspected February 2024
- Type
- Truss - Thru
- Steel
- Length
- 172 ft
- 1 main span
- Daily traffic
- 10
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
250 ST over Tarkio Rvr is a steel truss - thru carrying 250 ST over Tarkio Rvr in Atchison County, Missouri. It was built in 1975, so it is 50 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 12 by 2044. The structure is 172 ft (52.4 m) long and 22 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 250 ST over Tarkio Rvr built?
It was built in 1975, making it 50 years old in 2025.
What condition is 250 ST over Tarkio Rvr in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2024.
How much traffic does 250 ST over Tarkio Rvr carry?
About 10 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is 250 ST over Tarkio Rvr?
The structure is 172 ft (52.4 m) long with a longest span of 100 ft (30.5 m) and a deck 22 ft wide.
Who owns 250 ST over Tarkio Rvr?
It is owned by the County Highway Agency.