Is 29 S over Levee Maint. RD Nishn
GoodAtchison County, Missouri · S 3 T 66 N R 42 W · Structure no. 2043
- Built
- 1971
- 54 years old, rebuilt 2021
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 998 ft
- 3 main spans
- Daily traffic
- 8,382
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Is 29 S over Levee Maint. RD Nishn is a steel continuous stringer/multi-beam or girder carrying Is 29 S over Levee Maint. RD Nishn in Atchison County, Missouri. It was built in 1971 and reconstructed in 2021, so it is 54 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,382 vehicles a day, roughly 42% of them trucks, projected to reach 17,602 by 2044. The structure is 998 ft (304.2 m) long and 41 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Is 29 S over Levee Maint. RD Nishn built?
It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2021.
What condition is Is 29 S over Levee Maint. RD Nishn in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Is 29 S over Levee Maint. RD Nishn carry?
About 8,382 vehicles per day (2024 count), of which roughly 42% are trucks.
How long is Is 29 S over Levee Maint. RD Nishn?
The structure is 998 ft (304.2 m) long with a longest span of 160 ft (48.8 m) and a deck 41 ft wide.
Who owns Is 29 S over Levee Maint. RD Nishn?
It is owned by the State Highway Agency.