Andrew County, Missouri · S 30 T 59 N R 35 W · Structure no. 36223

Built
2019
6 years old
Condition
Good
inspected December 2023
Type
Slab
Concrete
Length
52 ft
1 main span
Daily traffic
10
2024 count
Owner
County
County Highway Agency

About this bridge

County RD 368 over Hopkins CR is a concrete slab carrying County RD 368 over Hopkins CR in Andrew County, Missouri. It was built in 2019, so it is 6 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 12 by 2044. The structure is 52 ft (15.8 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty RD 368
CrossesHopkins CR
LocationS 30 T 59 N R 35 W
RouteCounty Highway 368
Coordinates39.90708, -94.86155
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.5 US tons
Inventory rating35.7 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length52 ft (15.8 m)
Longest span51 ft (15.5 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2024)
Projected traffic12 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 368 over Hopkins CR built?

It was built in 2019, making it 6 years old in 2025.

What condition is County RD 368 over Hopkins CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does County RD 368 over Hopkins CR carry?

About 10 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is County RD 368 over Hopkins CR?

The structure is 52 ft (15.8 m) long with a longest span of 51 ft (15.5 m) and a deck 29 ft wide.

Who owns County RD 368 over Hopkins CR?

It is owned by the County Highway Agency.