County RD 127 over Lower Neely Br
FairPosted for loadAndrew County, Missouri · S 26 T 61 N R 35 W · Structure no. 16634
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 20
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 127 over Lower Neely Br is a steel stringer/multi-beam or girder carrying County RD 127 over Lower Neely Br in Andrew County, Missouri. It was built in 1975, so it is 50 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 23 by 2044. The structure is 31 ft (9.4 m) long and 20 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 127 over Lower Neely Br built?
It was built in 1975, making it 50 years old in 2025.
What condition is County RD 127 over Lower Neely Br in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does County RD 127 over Lower Neely Br carry?
About 20 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is County RD 127 over Lower Neely Br?
The structure is 31 ft (9.4 m) long with a longest span of 29 ft (8.8 m) and a deck 20 ft wide.
Who owns County RD 127 over Lower Neely Br?
It is owned by the County Highway Agency.