County RD 125 over Upper Neely Br
FairPosted for loadAndrew County, Missouri · S 11 T 61 N R 35 W · Structure no. 16564
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected December 2023
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 83 ft
- 3 main spans
- Daily traffic
- 35
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County RD 125 over Upper Neely Br is a steel continuous girder and floorbeam system carrying County RD 125 over Upper Neely Br in Andrew County, Missouri. It was built in 1975, so it is 50 years old, older than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 35 vehicles a day, roughly 10% of them trucks, projected to reach 40 by 2044. The structure is 83 ft (25.3 m) long and 20 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County RD 125 over Upper Neely Br built?
It was built in 1975, making it 50 years old in 2025.
What condition is County RD 125 over Upper Neely Br in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does County RD 125 over Upper Neely Br carry?
About 35 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is County RD 125 over Upper Neely Br?
The structure is 83 ft (25.3 m) long with a longest span of 40 ft (12.2 m) and a deck 20 ft wide.
Who owns County RD 125 over Upper Neely Br?
It is owned by the County Highway Agency.