US Bridges

Mo 149 S over Shuteye CR

Good

Adair County, Missouri · S 9 T 63 N R 16 W · Structure no. 36536

Built
2021
4 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
124 ft
3 main spans
Daily traffic
275
2024 count
Owner
State
State Highway Agency

About this bridge

Mo 149 S over Shuteye CR is a prestressed concrete continuous box beam or girders - single or spread carrying Mo 149 S over Shuteye CR in Adair County, Missouri. It was built in 2021, so it is 4 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 275 vehicles a day, roughly 4% of them trucks, projected to reach 344 by 2044. The structure is 124 ft (37.8 m) long and 27 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesMo 149 S
CrossesShuteye CR
LocationS 9 T 63 N R 16 W
RouteState Highway 149
Coordinates40.28161, -92.70029
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating79.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length124 ft (37.8 m)
Longest span61 ft (18.6 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic275 (2024)
Projected traffic344 by 2044
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mo 149 S over Shuteye CR built?

It was built in 2021, making it 4 years old in 2025.

What condition is Mo 149 S over Shuteye CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Mo 149 S over Shuteye CR carry?

About 275 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Mo 149 S over Shuteye CR?

The structure is 124 ft (37.8 m) long with a longest span of 61 ft (18.6 m) and a deck 27 ft wide.

Who owns Mo 149 S over Shuteye CR?

It is owned by the State Highway Agency.