US Bridges

Rt a S over N Fk Salt River

Good

Adair County, Missouri · S 23 T 64 N R 15 W · Structure no. 33335

Built
2011
14 years old
Condition
Good
inspected December 2021
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
142 ft
2 main spans
Daily traffic
574
2024 count
Owner
State
State Highway Agency

About this bridge

Rt a S over N Fk Salt River is a prestressed concrete box beam or girders - multiple carrying Rt a S over N Fk Salt River in Adair County, Missouri. It was built in 2011, so it is 14 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 574 vehicles a day, roughly 10% of them trucks, projected to reach 718 by 2044. The structure is 142 ft (43.3 m) long and 26 ft wide. If it were closed, the detour would be 29.2 mi (47 km).

CarriesRt a S
CrossesN Fk Salt River
LocationS 23 T 64 N R 15 W
RouteState Highway 0A
Coordinates40.32994, -92.5508
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.5 US tons
Inventory rating36.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length142 ft (43.3 m)
Longest span75 ft (22.9 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic574 (2024)
Projected traffic718 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.2 mi (47 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Rt a S over N Fk Salt River built?

It was built in 2011, making it 14 years old in 2025.

What condition is Rt a S over N Fk Salt River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2021.

How much traffic does Rt a S over N Fk Salt River carry?

About 574 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Rt a S over N Fk Salt River?

The structure is 142 ft (43.3 m) long with a longest span of 75 ft (22.9 m) and a deck 26 ft wide.

Who owns Rt a S over N Fk Salt River?

It is owned by the State Highway Agency.