Berry Trail over Trib to Walnut CR
GoodAdair County, Missouri · S 23 T 61 N R 17 W · Structure no. 29780
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 10
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Berry Trail over Trib to Walnut CR is a steel continuous stringer/multi-beam or girder carrying Berry Trail over Trib to Walnut CR in Adair County, Missouri. It was built in 2002, so it is 23 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10 vehicles a day, roughly 10% of them trucks, projected to reach 11 by 2044. The structure is 80 ft (24.4 m) long and 16 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Berry Trail over Trib to Walnut CR built?
It was built in 2002, making it 23 years old in 2025.
What condition is Berry Trail over Trib to Walnut CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Berry Trail over Trib to Walnut CR carry?
About 10 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Berry Trail over Trib to Walnut CR?
The structure is 80 ft (24.4 m) long with a longest span of 39 ft (11.9 m) and a deck 16 ft wide.
Who owns Berry Trail over Trib to Walnut CR?
It is owned by the County Highway Agency.