Sun Valley Way over Trib N Fk S Fabius
GoodAdair County, Missouri · S 4 T 63 N R 13 W · Structure no. 28792
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 51 ft
- 1 main span
- Daily traffic
- 15
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
Sun Valley Way over Trib N Fk S Fabius is a steel stringer/multi-beam or girder carrying Sun Valley Way over Trib N Fk S Fabius in Adair County, Missouri. It was built in 2000, so it is 25 years old, younger than the Missouri average of 45.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15 vehicles a day, roughly 10% of them trucks, projected to reach 17 by 2044. The structure is 51 ft (15.5 m) long and 16 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sun Valley Way over Trib N Fk S Fabius built?
It was built in 2000, making it 25 years old in 2025.
What condition is Sun Valley Way over Trib N Fk S Fabius in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Sun Valley Way over Trib N Fk S Fabius carry?
About 15 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is Sun Valley Way over Trib N Fk S Fabius?
The structure is 51 ft (15.5 m) long with a longest span of 49 ft (14.9 m) and a deck 16 ft wide.
Who owns Sun Valley Way over Trib N Fk S Fabius?
It is owned by the County Highway Agency.