US Bridges

Millay Trail over Goose CR

Fair

Adair County, Missouri · S 5 T 61 N R 16 W · Structure no. 23214

Built
1992
33 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
100 ft
3 main spans
Daily traffic
20
2024 count
Owner
County
County Highway Agency

About this bridge

Millay Trail over Goose CR is a steel stringer/multi-beam or girder carrying Millay Trail over Goose CR in Adair County, Missouri. It was built in 1992, so it is 33 years old, younger than the Missouri average of 45.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20 vehicles a day, roughly 10% of them trucks, projected to reach 22 by 2044. The structure is 100 ft (30.5 m) long and 16 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesMillay Trail
CrossesGoose CR
LocationS 5 T 61 N R 16 W
RouteCounty Highway 396
Coordinates40.12113, -92.72129
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98.2 US tons
Inventory rating76.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadOther
Structure length100 ft (30.5 m)
Longest span50 ft (15.2 m)
Deck width16 ft (4.9 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20 (2024)
Projected traffic22 by 2044
Trucks10%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Millay Trail over Goose CR built?

It was built in 1992, making it 33 years old in 2025.

What condition is Millay Trail over Goose CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Millay Trail over Goose CR carry?

About 20 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Millay Trail over Goose CR?

The structure is 100 ft (30.5 m) long with a longest span of 50 ft (15.2 m) and a deck 16 ft wide.

Who owns Millay Trail over Goose CR?

It is owned by the County Highway Agency.