US Bridges

Msas 108 over S Fk Crow River

Fair

Wright County, Minnesota · 0.1 MI E of JCT TH 12 · Structure no. 86501

Built
1965
60 years old
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
161 ft
3 main spans
Daily traffic
7,390
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Msas 108 over S Fk Crow River is a steel continuous stringer/multi-beam or girder carrying Msas 108 over S Fk Crow River in Wright County, Minnesota. It was built in 1965, so it is 60 years old, older than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,390 vehicles a day, projected to reach 6,700 by 2042. The structure is 161 ft (49.1 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMsas 108
CrossesS Fk Crow River
Location0.1 MI E of JCT TH 12
RouteCity Street 108
Coordinates45.04194, -93.78982
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.5 US tons
Inventory rating32 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length161 ft (49.1 m)
Longest span60 ft (18.4 m)
Deck width40 ft (12.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,390 (2022)
Projected traffic6,700 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Msas 108 over S Fk Crow River built?

It was built in 1965, making it 60 years old in 2025.

What condition is Msas 108 over S Fk Crow River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does Msas 108 over S Fk Crow River carry?

About 7,390 vehicles per day (2022 count).

How long is Msas 108 over S Fk Crow River?

The structure is 161 ft (49.1 m) long with a longest span of 60 ft (18.4 m) and a deck 40 ft wide.

Who owns Msas 108 over S Fk Crow River?

It is owned by the City or Municipal Highway Agency.