US Bridges

Csah 12 over I 90

Good

Winona County, Minnesota · 4.2 MI W of N JCT TH 61 · Structure no. 85862

Built
2020
5 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
231 ft
2 main spans
Daily traffic
4,800
2015 count
Owner
State
State Highway Agency

About this bridge

Csah 12 over I 90 is a prestressed concrete stringer/multi-beam or girder carrying Csah 12 over I 90 in Winona County, Minnesota. It was built in 2020, so it is 5 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,800 vehicles a day, projected to reach 3,970 by 2040. The structure is 231 ft (70.5 m) long and 39 ft wide.

CarriesCsah 12
CrossesI 90
Location4.2 MI W of N JCT TH 61
RouteCounty Highway 12
Coordinates43.92598, -91.43872
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.6 US tons
Inventory rating41.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length231 ft (70.5 m)
Longest span115 ft (34.9 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,800 (2015)
Projected traffic3,970 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Csah 12 over I 90 built?

It was built in 2020, making it 5 years old in 2025.

What condition is Csah 12 over I 90 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Csah 12 over I 90 carry?

About 4,800 vehicles per day (2015 count).

How long is Csah 12 over I 90?

The structure is 231 ft (70.5 m) long with a longest span of 115 ft (34.9 m) and a deck 39 ft wide.

Who owns Csah 12 over I 90?

It is owned by the State Highway Agency.