US Bridges

I 90 over Aoi; Mississippi River

Good

Winona County, Minnesota · At Minn/Wisc State Line · Structure no. 85802

Built
2015
10 years old
Condition
Good
inspected October 2024
Type
Segmental Box Girder
Prestressed Concrete
Length
2,593 ft
4 main spans
Daily traffic
13,950
2021 count
Owner
State
State Highway Agency

About this bridge

I 90 over Aoi; Mississippi River is a prestressed concrete segmental box girder carrying I 90 over Aoi; Mississippi River in Winona County, Minnesota. It was built in 2015, so it is 10 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,950 vehicles a day, roughly 15% of them trucks, projected to reach 13,000 by 2041. The structure is 2,593 ft (790.2 m) long and 45 ft wide. If it were closed, the detour would be 16.2 mi (26 km).

CarriesI 90
CrossesAoi; Mississippi River
LocationAt Minn/Wisc State Line
RouteInterstate 90
Coordinates43.85801, -91.30028
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4 (+6 approach)
Design loadHL 93
Structure length2,593 ft (790.2 m)
Longest span508 ft (154.8 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,950 (2021)
Projected traffic13,000 by 2041
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed16.2 mi (26 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was I 90 over Aoi; Mississippi River built?

It was built in 2015, making it 10 years old in 2025.

What condition is I 90 over Aoi; Mississippi River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does I 90 over Aoi; Mississippi River carry?

About 13,950 vehicles per day (2021 count), of which roughly 15% are trucks.

How long is I 90 over Aoi; Mississippi River?

The structure is 2,593 ft (790.2 m) long with a longest span of 508 ft (154.8 m) and a deck 45 ft wide.

Who owns I 90 over Aoi; Mississippi River?

It is owned by the State Highway Agency.