US Bridges

T 62 over Garvin Brook

Good

Winona County, Minnesota · 0.6 MI E of JCT Csah 23 · Structure no. 85570

Built
2008
17 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
129 ft
1 main span
Daily traffic
60
2008 count
Owner
State
State Park, Forest, or Reservation Agency

About this bridge

T 62 over Garvin Brook is a prestressed concrete stringer/multi-beam or girder carrying T 62 over Garvin Brook in Winona County, Minnesota. It was built in 2008, so it is 17 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, projected to reach 60 by 2028. The structure is 129 ft (39.3 m) long and 23 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 62
CrossesGarvin Brook
Location0.6 MI E of JCT Csah 23
RouteCounty Highway 62
Coordinates44.0559, -91.7477
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating109.8 US tons
Inventory rating54 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length129 ft (39.3 m)
Longest span124 ft (37.8 m)
Deck width23 ft (7.1 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2008)
Projected traffic60 by 2028
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Park, Forest, or Reservation Agency
Maintained byState Park, Forest, or Reservation Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 62 over Garvin Brook built?

It was built in 2008, making it 17 years old in 2025.

What condition is T 62 over Garvin Brook in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does T 62 over Garvin Brook carry?

About 60 vehicles per day (2008 count).

How long is T 62 over Garvin Brook?

The structure is 129 ft (39.3 m) long with a longest span of 124 ft (37.8 m) and a deck 23 ft wide.

Who owns T 62 over Garvin Brook?

It is owned by the State Park, Forest, or Reservation Agency.