T 69 over CO Ditch # 3
GoodWilkin County, Minnesota · 0.1 MI E of JCT Csah 16 · Structure no. 84J19
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected October 2021
- Type
- Culvert
- Concrete
- Length
- 25 ft
- 2 main spans
- Daily traffic
- 17
- 1998 count
- Owner
- County
- County Highway Agency
About this bridge
T 69 over CO Ditch # 3 is a concrete culvert carrying T 69 over CO Ditch # 3 in Wilkin County, Minnesota. It was built in 1998, so it is 27 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17 vehicles a day, projected to reach 17 by 2029. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T 69 over CO Ditch # 3 built?
It was built in 1998, making it 27 years old in 2025.
What condition is T 69 over CO Ditch # 3 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.
How much traffic does T 69 over CO Ditch # 3 carry?
About 17 vehicles per day (1998 count).
How long is T 69 over CO Ditch # 3?
The structure is 25 ft (7.6 m) long with a longest span of 10 ft (3.1 m).
Who owns T 69 over CO Ditch # 3?
It is owned by the County Highway Agency.