US 75 over Flood Diversion Channel
FairWilkin County, Minnesota · 1.0 MI N of N JCT TH 210 · Structure no. 84530
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 143 ft
- 1 main span
- Daily traffic
- 1,318
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US 75 over Flood Diversion Channel is a prestressed concrete stringer/multi-beam or girder carrying US 75 over Flood Diversion Channel in Wilkin County, Minnesota. It was built in 2003, so it is 22 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,318 vehicles a day, roughly 13% of them trucks, projected to reach 1,550 by 2042. The structure is 143 ft (43.6 m) long and 46 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 75 over Flood Diversion Channel built?
It was built in 2003, making it 22 years old in 2025.
What condition is US 75 over Flood Diversion Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does US 75 over Flood Diversion Channel carry?
About 1,318 vehicles per day (2022 count), of which roughly 13% are trucks.
How long is US 75 over Flood Diversion Channel?
The structure is 143 ft (43.6 m) long with a longest span of 138 ft (42.1 m) and a deck 46 ft wide.
Who owns US 75 over Flood Diversion Channel?
It is owned by the State Highway Agency.