US Bridges

M 80 over Stream

Good

Wabasha County, Minnesota · 1.0 MI SW of JCT TH 60 · Structure no. 79J58

Built
2006
19 years old
Condition
Good
inspected October 2021
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
10
2006 count
Owner
City
City or Municipal Highway Agency

About this bridge

M 80 over Stream is a concrete culvert carrying M 80 over Stream in Wabasha County, Minnesota. It was built in 2006, so it is 19 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 10 by 2029. The structure is 31 ft (9.6 m) long. If it were closed, the detour would be 123 mi (198 km).

CarriesM 80
CrossesStream
Location1.0 MI SW of JCT TH 60
RouteCity Street 80
Coordinates44.36002, -92.05695
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.6 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length31 ft (9.6 m)
Longest span13 ft (3.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2006)
Projected traffic10 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123 mi (198 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was M 80 over Stream built?

It was built in 2006, making it 19 years old in 2025.

What condition is M 80 over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does M 80 over Stream carry?

About 10 vehicles per day (2006 count).

How long is M 80 over Stream?

The structure is 31 ft (9.6 m) long with a longest span of 13 ft (3.9 m).

Who owns M 80 over Stream?

It is owned by the City or Municipal Highway Agency.