US Bridges

T 205 over Ditch

Good

Swift County, Minnesota · 1.1 MI N of JCT CSAH6 · Structure no. 76524

Built
1997
28 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
94 ft
1 main span
Daily traffic
17
1986 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 205 over Ditch is a prestressed concrete stringer/multi-beam or girder carrying T 205 over Ditch in Swift County, Minnesota. It was built in 1997, so it is 28 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17 vehicles a day, projected to reach 17 by 2029. The structure is 94 ft (28.8 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesT 205
CrossesDitch
Location1.1 MI N of JCT CSAH6
RouteCounty Highway 205
Coordinates45.21021, -95.65443
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating79.7 US tons
Inventory rating43.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length94 ft (28.8 m)
Longest span93 ft (28.3 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17 (1986)
Projected traffic17 by 2029
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 205 over Ditch built?

It was built in 1997, making it 28 years old in 2025.

What condition is T 205 over Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does T 205 over Ditch carry?

About 17 vehicles per day (1986 count).

How long is T 205 over Ditch?

The structure is 94 ft (28.8 m) long with a longest span of 93 ft (28.3 m) and a deck 31 ft wide.

Who owns T 205 over Ditch?

It is owned by the Town or Township Highway Agency.