US Bridges

CR 98 over Straight River

Fair

Steele County, Minnesota · 0.9 MI W of JCT Csah 13 · Structure no. 74529

Built
1978
47 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
158 ft
3 main spans
Daily traffic
30
2008 count
Owner
County
County Highway Agency

About this bridge

CR 98 over Straight River is a steel continuous stringer/multi-beam or girder carrying CR 98 over Straight River in Steele County, Minnesota. It was built in 1978, so it is 47 years old, older than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30 vehicles a day, projected to reach 30 by 2035. The structure is 158 ft (48.3 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR 98
CrossesStraight River
Location0.9 MI W of JCT Csah 13
RouteCounty Highway 98
Coordinates44.1965, -93.23531
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.4 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length158 ft (48.3 m)
Longest span60 ft (18.3 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2008)
Projected traffic30 by 2035
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 98 over Straight River built?

It was built in 1978, making it 47 years old in 2025.

What condition is CR 98 over Straight River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does CR 98 over Straight River carry?

About 30 vehicles per day (2008 count).

How long is CR 98 over Straight River?

The structure is 158 ft (48.3 m) long with a longest span of 60 ft (18.3 m) and a deck 35 ft wide.

Who owns CR 98 over Straight River?

It is owned by the County Highway Agency.