Csah 8 over S Br Rush R(jtditch 1-A)
GoodSibley County, Minnesota · 0.1 MI E of JCT Csah 17 · Structure no. 72538
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 122 ft
- 3 main spans
- Daily traffic
- 2,150
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Csah 8 over S Br Rush R(jtditch 1-A) is a concrete continuous slab carrying Csah 8 over S Br Rush R(jtditch 1-A) in Sibley County, Minnesota. It was built in 2005, so it is 20 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,150 vehicles a day, projected to reach 2,150 by 2038. The structure is 122 ft (37.3 m) long and 47 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Csah 8 over S Br Rush R(jtditch 1-A) built?
It was built in 2005, making it 20 years old in 2025.
What condition is Csah 8 over S Br Rush R(jtditch 1-A) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Csah 8 over S Br Rush R(jtditch 1-A) carry?
About 2,150 vehicles per day (2018 count).
How long is Csah 8 over S Br Rush R(jtditch 1-A)?
The structure is 122 ft (37.3 m) long with a longest span of 46 ft (14 m) and a deck 47 ft wide.
Who owns Csah 8 over S Br Rush R(jtditch 1-A)?
It is owned by the County Highway Agency.