US Bridges

Csah 5 over Elk River

Good

Sherburne County, Minnesota · 0.5 MI S of JCT CR 75 · Structure no. 71527

Built
2011
14 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
134 ft
2 main spans
Daily traffic
4,700
2020 count
Owner
County
County Highway Agency

About this bridge

Csah 5 over Elk River is a prestressed concrete stringer/multi-beam or girder carrying Csah 5 over Elk River in Sherburne County, Minnesota. It was built in 2011, so it is 14 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,700 vehicles a day, projected to reach 7,500 by 2040. The structure is 134 ft (40.7 m) long and 43 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesCsah 5
CrossesElk River
Location0.5 MI S of JCT CR 75
RouteCounty Highway 5
Coordinates45.36541, -93.74856
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.7 US tons
Inventory rating38.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length134 ft (40.7 m)
Longest span66 ft (20.1 m)
Deck width43 ft (13.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,700 (2020)
Projected traffic7,500 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 5 over Elk River built?

It was built in 2011, making it 14 years old in 2025.

What condition is Csah 5 over Elk River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Csah 5 over Elk River carry?

About 4,700 vehicles per day (2020 count).

How long is Csah 5 over Elk River?

The structure is 134 ft (40.7 m) long with a longest span of 66 ft (20.1 m) and a deck 43 ft wide.

Who owns Csah 5 over Elk River?

It is owned by the County Highway Agency.