US Bridges

Msas 111 over Relief Waterway

Good

Scott County, Minnesota · 0.8 MI N of JCT Csah 16 · Structure no. R0713

Built
1995
30 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
31 ft
2 main spans
Daily traffic
1,850
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Msas 111 over Relief Waterway is a concrete culvert carrying Msas 111 over Relief Waterway in Scott County, Minnesota. It was built in 1995, so it is 30 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,850 vehicles a day, projected to reach 1,650 by 2039. The structure is 31 ft (9.3 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesMsas 111
CrossesRelief Waterway
Location0.8 MI N of JCT Csah 16
RouteCity Street 111
Coordinates44.79358, -93.50076
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.6 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length31 ft (9.3 m)
Longest span13 ft (3.9 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,850 (2019)
Projected traffic1,650 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Msas 111 over Relief Waterway built?

It was built in 1995, making it 30 years old in 2025.

What condition is Msas 111 over Relief Waterway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Msas 111 over Relief Waterway carry?

About 1,850 vehicles per day (2019 count).

How long is Msas 111 over Relief Waterway?

The structure is 31 ft (9.3 m) long with a longest span of 13 ft (3.9 m).

Who owns Msas 111 over Relief Waterway?

It is owned by the City or Municipal Highway Agency.