US Bridges

T 1438 over Pelican River

Good

St. Louis County, Minnesota · 0.7 MI E of JCT TH 53 · Structure no. 69A78

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
87 ft
1 main span
Daily traffic
49
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

T 1438 over Pelican River is a prestressed concrete stringer/multi-beam or girder carrying T 1438 over Pelican River in St. Louis County, Minnesota. It was built in 2023, so it is 2 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, projected to reach 49 by 2042. The structure is 87 ft (26.5 m) long and 31 ft wide. If it were closed, the detour would be 123 mi (198 km).

CarriesT 1438
CrossesPelican River
Location0.7 MI E of JCT TH 53
RouteCounty Highway 1438
Coordinates48.03373, -92.81972
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating49.6 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length87 ft (26.5 m)
Longest span85 ft (25.8 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2022)
Projected traffic49 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123 mi (198 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was T 1438 over Pelican River built?

It was built in 2023, making it 2 years old in 2025.

What condition is T 1438 over Pelican River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does T 1438 over Pelican River carry?

About 49 vehicles per day (2022 count).

How long is T 1438 over Pelican River?

The structure is 87 ft (26.5 m) long with a longest span of 85 ft (25.8 m) and a deck 31 ft wide.

Who owns T 1438 over Pelican River?

It is owned by the Town or Township Highway Agency.