US Bridges

Mn 1 over Sturgeon River

Fair

St. Louis County, Minnesota · 8.5 MI W of JCT TH 73 · Structure no. 69112

Built
1992
33 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
490 ft
6 main spans
Daily traffic
130
2019 count
Owner
State
State Highway Agency

About this bridge

Mn 1 over Sturgeon River is a steel continuous stringer/multi-beam or girder carrying Mn 1 over Sturgeon River in St. Louis County, Minnesota. It was built in 1992, so it is 33 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 130 vehicles a day, roughly 23% of them trucks, projected to reach 105 by 2039. The structure is 490 ft (149.4 m) long and 38 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesMn 1
CrossesSturgeon River
Location8.5 MI W of JCT TH 73
RouteState Highway 1
Coordinates47.86553, -93.03567
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating86.8 US tons
Inventory rating52 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 25 or greater
Structure length490 ft (149.4 m)
Longest span86 ft (26.2 m)
Deck width38 ft (11.6 m)
Roadway width35 ft (10.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic130 (2019)
Projected traffic105 by 2039
Trucks23%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mn 1 over Sturgeon River built?

It was built in 1992, making it 33 years old in 2025.

What condition is Mn 1 over Sturgeon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Mn 1 over Sturgeon River carry?

About 130 vehicles per day (2019 count), of which roughly 23% are trucks.

How long is Mn 1 over Sturgeon River?

The structure is 490 ft (149.4 m) long with a longest span of 86 ft (26.2 m) and a deck 38 ft wide.

Who owns Mn 1 over Sturgeon River?

It is owned by the State Highway Agency.