T 148 over Spring Water Creek
GoodRock County, Minnesota · 0.1 MI W of JCT TH 23 · Structure no. 67K14
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected September 2021
- Type
- Culvert
- Concrete
- Length
- 26 ft
- 2 main spans
- Daily traffic
- 105
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
T 148 over Spring Water Creek is a concrete culvert carrying T 148 over Spring Water Creek in Rock County, Minnesota. It was built in 2013, so it is 12 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 105 vehicles a day, projected to reach 49 by 2042. The structure is 26 ft (7.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T 148 over Spring Water Creek built?
It was built in 2013, making it 12 years old in 2025.
What condition is T 148 over Spring Water Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.
How much traffic does T 148 over Spring Water Creek carry?
About 105 vehicles per day (2022 count).
How long is T 148 over Spring Water Creek?
The structure is 26 ft (7.9 m) long with a longest span of 12 ft (3.7 m).
Who owns T 148 over Spring Water Creek?
It is owned by the Town or Township Highway Agency.