Csah 3 over Kanaranzi Creek
GoodRock County, Minnesota · 2.0 MI S of JCT Csah 1 · Structure no. 67540
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected September 2024
- Type
- Slab
- Concrete Continuous
- Length
- 142 ft
- 3 main spans
- Daily traffic
- 325
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Csah 3 over Kanaranzi Creek is a concrete continuous slab carrying Csah 3 over Kanaranzi Creek in Rock County, Minnesota. It was built in 2000, so it is 25 years old, younger than the Minnesota average of 38.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 325 vehicles a day, projected to reach 255 by 2038. The structure is 142 ft (43.4 m) long and 39 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Csah 3 over Kanaranzi Creek built?
It was built in 2000, making it 25 years old in 2025.
What condition is Csah 3 over Kanaranzi Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Csah 3 over Kanaranzi Creek carry?
About 325 vehicles per day (2018 count).
How long is Csah 3 over Kanaranzi Creek?
The structure is 142 ft (43.4 m) long with a longest span of 56 ft (17.1 m) and a deck 39 ft wide.
Who owns Csah 3 over Kanaranzi Creek?
It is owned by the County Highway Agency.