US Bridges

Csah 17 over Cd 63

Good

Renville County, Minnesota · 1.0 MI W of JCT TH 71 · Structure no. 65J49

Built
2012
13 years old
Condition
Good
inspected October 2022
Type
Culvert
Concrete
Length
30 ft
2 main spans
Daily traffic
295
2019 count
Owner
County
County Highway Agency

About this bridge

Csah 17 over Cd 63 is a concrete culvert carrying Csah 17 over Cd 63 in Renville County, Minnesota. It was built in 2012, so it is 13 years old, younger than the Minnesota average of 38.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 295 vehicles a day, projected to reach 330 by 2039. The structure is 30 ft (9.2 m) long. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCsah 17
CrossesCd 63
Location1.0 MI W of JCT TH 71
RouteCounty Highway 17
Coordinates44.73054, -95.0154
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length30 ft (9.2 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic295 (2019)
Projected traffic330 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Csah 17 over Cd 63 built?

It was built in 2012, making it 13 years old in 2025.

What condition is Csah 17 over Cd 63 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2022.

How much traffic does Csah 17 over Cd 63 carry?

About 295 vehicles per day (2019 count).

How long is Csah 17 over Cd 63?

The structure is 30 ft (9.2 m) long with a longest span of 14 ft (4.3 m).

Who owns Csah 17 over Cd 63?

It is owned by the County Highway Agency.